Project:
Modular system of waste water treatment
Registration number:CZ.01.1.02/0.0/0.0/15_019/0004748
Realization period:01.02. 2017 – 31.12. 2019
Leader at TUL:prof. Dr. Ing. Jiří Maryška, CSc.
Project:
Registration number:CZ.01.1.02/0.0/0.0/15_019/0004748
Realization period:01.02. 2017 – 31.12. 2019
Leader at TUL:prof. Dr. Ing. Jiří Maryška, CSc.