+420 485 353 852|

cxi@tul.cz|

Staff


Project:

Integrované vzorkovače pro čistírny odpadních vod a úpravny vod

Registration number:FW06010181

Realization period:01.03. 2023 – 31.08. 2025

Leader at TUL:Ing. Tomáš Lederer, Ph.D.

The aim of the project is to develop our own sampling system for automatic sampling of water treatment plants (WTP) and wastewater treatment plants (WWTP). This sampler will be integrated into the control system (CS) of the relevant technology and will be able to respond to the parameters that existing CS already measures and uses. These are smaller plants where there is no stationary sampler. As part of the sampler development, a system for measuring basic physico-chemical parameters (pH, temperature, ORP, turbidity) that are not integrated in the existing technology will also be developed, applied and verified. The main advantage is the saving of operating costs and the possibility of starting the sampler on basis of the remote monitoring and management of the technological process.

General partners

Škoda AUTO
Česká Zbrojovka
Aquatest
Elmarco
FM Motol
Preciosa
UJV Group
Atrea
Innogy
Auren